Model Prioritisasi untuk Manajemen Portofolio Proyek Aplikasi di E-Government: Literatur Review
(1) Institut Teknologi Sepuluh Nopember
(2) Institut Teknologi Sepuluh Nopember
(*) Corresponding Author
Abstrak
Kata Kunci
Teks Lengkap:
PDFReferensi
[1] E. S. Holle, “Public Service Through Electronic Government: Efforts to Minimize Practices in Administration in Improving Public Service,” Journal of SASI, vol. 17, pp. 21-30, 2011.
[2] Kemkominfo. “Ministry of Communications and Informatics Indonesia.” Internet : https://www.neliti.com/kominfo?page=2, [2018].
[3] P. L. Pereira and F. M. Veloso, “R&D activity selection process: Building a strategy-aligned R&D portfolio for government and nonprofit organizations,” IEEE Trans. Eng. Manag., vol. 56, no. 1, pp. 95–105, 2009.
[4] N. Purushottam and P. D. Rwelamila, “Project Management Trilogy Challenges in Africa - Where to From Here?,” Proj. Manag. J., vol. 43, no. 4, pp. 5–13, 2012.
[5] S. Lee, S. Kang, E. Park, and Y. Park, “Applying technology road-maps in project selection and planning,” Int. J. Qual. Reliab. Manag., vol. 25, no. 1, pp. 39–51, Jan. 2008.
[6] J. Stentoft, P. V. Freytag, and L. Thoms, “Portfolio management of development projects in Danish municipalities,” Int. J. Public Sect. Manag., vol. 28, no. 1, pp. 11–28, Jan. 2015.
[7] E. Baker and S. Solak, “Management of energy technology for sustainability: How to fund energy technology research and development,” Prod. Oper. Manag., vol. 23, no. 3, pp. 348–365, 2014.
[8] M. Scheinberg and A. Stretton, “Multiproject planning: tuning portfolio indices,” Int. J. Proj. Manag., vol. 12, no. 2, pp. 107–114, May 1994.
[9] D. Dang and S. Pekkola, “Systematic Literature Review on Enterprise Architecture in the Public Sector,” Electron. J. e-Government, vol. 15, no. 1, p. 25, 2017.
[10] N. P. Archer and F. Ghasemzadeh, “An integrated framework for project portfolio selection,” Int. J. Proj. Manag., vol. 17, no. 4, pp. 207–216, Aug. 1999.
[11] B. Bozeman and J. Rogers, “Strategic management of government-sponsored R and D portfolios,” Environ. Plan. C Gov. Policy, vol. 19, no. 3, pp. 413–442, Jun. 2001.
[12] I. BARDHAN and R. SOUGSTAD, “Prioritizing a Portfolio of Information Technology Investment Projects,” J. Manag. Inf. Syst., vol. 21, no. 2, pp. 33–60, 2017.
[13] I. R. Bardhan, R. J. Kauffman, and S. Naranpanawe, “Optimizing an it project portfolio with time-wise interdependencies,” in Proceedings of the Annual Hawaii International Conference on System Sciences, 2006, vol. 8, p. 168b–168b.
[14] M. Benaroch, S. Shah, and M. Jeffery, “On the Valuation of Multistage Information Technology Investments Embedding Nested Real Options,” J. Manag. Inf. Syst., vol. 23, no. 1, pp. 239–261, Jun. 2007.
[15] B. S. Blichfeldt and P. Eskerod, “Project portfolio management - There’s more to it than what management enacts,” Int. J. Proj. Manag., vol. 26, no. 4, pp. 357–365, 2008.
[16] T. Blomquist and R. Müller, Practices, Roles, and Responsibilities of Middle Managers in Program and Portfolio Management, vol. 37, no. 1. 2018.
[17] J. C. Burke and M. J. Shaw, “IT portfolio management: A case study,” 14th Am. Conf. Inf. Syst. AMCIS 2008, vol. 6, pp. 3749–3759, 2008.
[18] R. H. Bryan Maizlish, IT (Information Technology) Portfolio Management Step-by-Step: Unlocking the Business Value of Technology. John Wiley & Sons, 2010.
[19] C. T. Chen and H. L. Cheng, “A comprehensive model for selecting information system project under fuzzy environment,” Int. J. Proj. Manag., vol. 27, no. 4, pp. 389–399, 2009.
[20] W. Cho and M. J. Shaw, “Does IT Synergy Matter in IT Portfolio Selection?,” Icis, p. 160, 2009.
[21] T. Y. Chou, S. cho T. Chou, and G. H. Tzeng, “Evaluating IT/IS investments: A fuzzy multi-criteria decision model approach,” Eur. J. Oper. Res., vol. 173, no. 3, pp. 1026–1046, 2006.
[22] D. Diepold, C. Ullrich, A. Wehrmann, and S. Zimmermann, “A real options approach for valuating intertemporal interdependencies within a value-based IT portfolio management - A risk-return perspective,” in Ecis, 2009, no. 2009, pp. 1–12.
[23] J. R. Drake and T. A. Byrd, “Risk in information technology project portfolio management,” J. Inf. Technol. Theory Appl., vol. 8, no. 3, p. 3, 2006.
[24] D. Simon, K. Fischbach and D. Schoder, “Application Portfolio Management-An Integrated Framework and a Software Tool Evaluation Approach,” Communications of the Association for Information Systems, vol. 26, no. 3, pp. 35-56, 2010.
[25] H. Eilat, B. Golany, and A. Shtub, “Constructing and evaluating balanced portfolios of R&D projects with interactions: A DEA based methodology,” Eur. J. Oper. Res., vol. 172, no. 3, pp. 1018–1039, 2006.
[26] S. Elonen and K. A. Artto, “Problems in managing internal development projects in multi-project environments,” Int. J. Proj. Manag., vol. 21, no. 6, pp. 395–402, 2003.
[27] M. Engwall and A. Jerbrant, “The resource allocation syndrome: The prime challenge of multi-project management?,” Int. J. Proj. Manag., vol. 21, no. 6, pp. 403–409, 2003.
[28] E. a Van Ramshorst, “Application Portfolio Management from an Enterprise Architecture Perspective.” pp. 1–111, 2013.
[29] J. J. Jiang and G. Klein, “Project selection criteria by strategic orientation,” Inf. Manag., vol. 36, no. 2, pp. 63–75, 1999.
[30] M. Adamsson, “Developing an integrated conceptual model for portfolio-based IT management.” 2013.
[31] P. R. M. Maceta, F. T. Berssaneti, and M. M. de Carvalho, “Project Portfolio Management in the Public Sector : a literature review,” Produção Online, vol. 17, no. 1, pp. 222–244, 2017.
[32] A. Ogra and W. Thwala, E-Government Perspectives: Evolution, Strategies and Practices. 2014.
[33] J. Stentoft Arlbjørn, P. V. Freytag, and L. Thoms, “Portfolio management of development projects in Danish municipalities,” Int. J. Public Sect. Manag., vol. 28, no. 1, pp. 11–28, 2015.
[34] G. C. S. Puthamont and C. Charoenngam, “Strategic project selection in public sector: Construction projects of the Ministry of Defence in Thailand,” Int. J. Proj. Manag., vol. 25, no. 2, pp. 178–188, 2007.
[35] J. J. Jiang and G. Klein, “Project selection criteria by strategic orientation,” Inf. Manag., vol. 36, no. 2, pp. 63–75, 1999.
[36] F. W. McFarlan, “Portfolio Approach to Information Systems,” IEEE Press Piscataway, pp. 142–150, 1981.
[37] C. C. Dutra, J. L. D. Ribeiro, and M. M. de Carvalho, “An economic–probabilistic model for project selection and prioritization,” Int. J. Proj. Manag., vol. 32, no. 6, pp. 1042–1055, 2014.
[38] R. Cooper, S. Edgett, and E. Kleinschmidt, “Portfolio management for new product development: results of an industry practices study,” r&D Manag., vol. 31, no. 4, pp. 361–380, 2001.
[39] R. Cooper, S. Edgett, and E. Kleinschmidt, “Portfolio management for new product development: results of an industry practices study,” r&D Manag., vol. 31, no. 4, pp. 361–380, 2001.
[40] E. Bas, “Engineering Applications of Artificial Intelligence Surrogate relaxation of a fuzzy multidimensional 0 – 1 knapsack model by surrogate constraint normalization rules and a methodology for multi-attribute project portfolio selection,” Eng. Appl. Artif. Intell., vol. 25, no. 5, pp. 958–970, 2012.
[41] T. Bakshi, A. Sinharay, B. Sarkar, and S. K. Sanyal, “Introduction to soft-set theoretic solution of project selection problem,” Benchmarking An Int. J., vol. 23, no. 7, pp. 1643–1657, 2016.
[42] S. Coldrick, P. Longhurst, P. Ivey, and J. Hannis, “An R&D options selection model for investment decisions,” Technovation, vol. 25, no. 3, pp. 185–193, 2005.
[43] R. Stewart and S. Mohamed, “IT/IS projects selection using multi-criteria utility theory,” Logist. Inf. Manag., vol. 15, no. 4, pp. 254–270, 2002.
[44] K. Benaija and L. Kjiri, “Project portfolio selection: Multi-criteria analysis and interactions between projects,” arXiv Prepr. arXiv1503.05366, 2015.
[45] R. G. Cooper and S. J. Edgett, “Portfolio management for new products: picking the winners,” Prod. Dev. Institute, Ancaster, Ontario, Canada, 2001.
Artikel Statistik
PDF telah dilihat : 1627 kali
Refbacks
- Saat ini tidak ada refbacks.
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.
Alamat Redaksi : Departemen Sistem Informasi, Fakultas Teknologi Informasi Universitas Andalas Kampus Limau Manis, Padang 25163, Sumatera Barat email: teknosi@fti.unand.ac.id |
Jumlah Pengunjung :
This work by JSI-Unand and licensed under a CC BY-SA 4.0 International License.